Skip to content
SIMM
Viaduct piers of the Bar–Boljare motorway under construction, with cranes on top

Alignments that put Montenegro on the map.

Transport-infrastructure consultants, Podgorica, since 2006. We have designed 136 of about 250 km of Montenegro's motorway network: Bar–Boljare and the Adriatic–Ionian corridor.

  • 136 km

    kilometres of motorway designed

  • 20

    years of experience

  • 250+

    completed references

  • 3

    state licences

The full cycle

From plan to acceptance

  1. Planning documentation

    Spatial and detailed plans, location studies and DPPs for transport infrastructure.

  2. Studies

    Traffic and technical studies underpinning planning and design documentation.

  3. Design documentation

    General, concept and main designs of motorways, roads and transport structures.

  4. Design review

    Revision and review of technical documentation under applicable regulations and standards.

  5. Construction supervision

    Professional supervision under FIDIC conditions during construction of transport structures.

  6. Technical acceptance

    Technical inspection and acceptance of completed transport infrastructure works.

Licences and memberships

Three state licences and FIDIC membership

We are licensed for planning documentation, construction design and execution of works, and as a member of the Association of Consulting Engineers of Montenegro and of FIDIC we apply the FIDIC conditions of contract.

  • 01-254/4

    Licence for planning documentation

  • 01-254/3

    Licence for civil engineering design

  • 05-963/3

    Licence for construction works

  • FIDIC

    International Federation of Consulting Engineers

  • FIDIC, International Federation of Consulting Engineers
  • TÜV AUSTRIA CERTIFIED: ISO 9001, ISO 14001, OHSAS 18001

Have a project on the alignment?

Send us the project brief or the tender documents and we will come back with a proposed scope and timeline.

+382 20 244 202office@simm.me